What the developer publishes
| Item | Published figure |
|---|---|
| Location | Thubarahalli, Marathahalli Main Road |
| Site area | 11.66 acres |
| Homes | 777 |
| Open space | about 81% |
| Homes per acre | about 67 |
| Built form | 7 towers |
| Clubhouse | 45,000 sq ft with 90+ amenities |
| Possession | December 2029, as per RERA |
| Nearest transit | Nallurhalli Metro about 7 min |
| Work | ORR side tech parks 6 to 9 min |
All figures are as published by the developer for this project. Prices are indicative, exclude GST, registration and other charges, and change with inventory. Confirm with the project team.
This site publishes the declared position: December 2029, as per RERA. It does not publish how many slabs are cast this month, because that changes and we do not hold it. What follows is how to get the current picture yourself, from the public record and from the site.
Read the quarterly filings
RERA: PRM/KA/RERA/1251/446/PR/111225/008330. Verify it at rera.karnataka.gov.in.
Every registered project files a Quarterly Progress Report with the regulator covering construction progress, approvals received and units booked. It is self reported, dated and public.
Search the registration on rera.karnataka.gov.in
Use the full number including the slashes. Confirm the project and promoter names match your paperwork.
Open the last two or three filings, not just the latest
The signal is the trend. Slabs cast per quarter tells you more about a December 2029 date than any projection.
Check whether the declared date has been extended
An extension is a fact in the record, and it is the single most useful thing you can learn before booking.
Compare the filing against what you see on site
Any gap between the two is the most productive question you can ask.
The full method is in how to check a RERA registration in seven steps.
What to look at on site
With a single phase and a lake setting, the visit has two jobs:
- How many floors are cast on your tower, against the published 7 tower configuration.
- What your unit actually overlooks, from your floor if the structure has reached it. A project level lake claim is not a unit level view.
- The distance between towers, since at about 67 homes per acre the spacing should be visible.
- How much of the 81% open space is formed versus still a construction yard.
- The approach from Marathahalli Main Road, and how long it takes to exit at peak hour.
Want the current construction status for Solace?
The project team can share the latest status, the approvals position and arrange a site visit at a time that suits you.
What to photograph
Photographs are dated and memory is not. They let you compare between visits, compare what you were shown against what is delivered, and raise specific questions with specific evidence.
- The project board showing the RERA number
- The site plan with your tower marked
- Your tower from the ground
- The view in each direction from your floor level, especially towards the lakes
- The gap between your tower and the next
- The approach road and the gate at peak hour
- The price sheet and specification you were handed
Questions to ask on site
- What stage is my tower at today, and what did the last filing claim?
- Has the December 2029 date been extended at any point?
- Which units and floors actually overlook the lakes?
- How many lifts serve my tower, and how many homes per floor?
- What are the prices for the three configurations published as on request?
- What is planned on the land adjoining the site?
Go back a second time
Once with the sales team, once unannounced on a weekday morning. The second visit shows you the working site rather than the presentation, and the commute at the hour you would actually make it. The full twenty point site visit checklist applies here.
What is the construction status of Sumadhura Solace?
The developer publishes the project as under construction with possession declared for December 2029 as per RERA. We do not publish live progress. Read the Quarterly Progress Reports filed under PRM/KA/RERA/1251/446/PR/111225/008330 on rera.karnataka.gov.in.
Does Solace have multiple RERA phases?
One registration is published for the project, which makes it simpler to track than a phased development. Confirm on the portal, and if a later phase is added it will carry its own registration.
How do I verify the lake view from my unit?
Visit and look, from your floor if the structure has reached it. The developer publishes that the towers overlook twin lakes, which is a project level statement. Which specific units and floors have that outlook is not published, and it is not something to pay a premium for on trust.
What should I check about tower spacing?
At roughly 67 homes per acre with about 81% open space, the gaps between towers should be visibly generous. Stand between two and look. Then check what your own windows face, because spacing on one side of a tower does not guarantee it on the other.
How often should I check progress after booking?
Once a quarter, when the new filing appears. Read the last two or three rather than only the latest, because the useful signal is the trend in work completed per quarter rather than a single snapshot.
What does December 2029 as per RERA mean?
It means the date published is the completion date declared to the regulator on the registration, rather than a marketing estimate. That is the date with legal weight, and it should match the date in your agreement for sale.