At a glance
| Item | Published figure |
|---|---|
| Location | Hope Farm Junction, Whitefield |
| Site area | 4.1 acres |
| Homes | 405 |
| Open space | about 73% |
| Homes per acre | about 99 |
| Built form | 4 towers of 3B+G+15 floors |
| Possession | December 2027 |
| Nearest transit | Kadugodi Tree Park Metro Station, about 180 m |
| Work | ITPL about 1.6 km, EPIP Zone about 2 km |
All figures are as published by the developer for this project. Prices are indicative, exclude GST, registration and other charges, and change with inventory. Confirm with the project team.
What stands out
Capitol Residences is the smallest site and the earliest completion among the communities covered here, and both follow from the same thing: 4.1 acres beside a metro station.
- Mivan monolithic aluminium formwork construction
- Vastu compliant layouts
- Zero vehicle podium
- No two towers face each other
What you give up
The earliest possession is also the shortest payment runway. On a construction linked plan, the same consideration is collected over fewer years, so the monthly commitment is higher than on a project completing in 2029.
And 405 homes on 4.1 acres works out at roughly 99 homes per acre, the densest of the four apartment communities covered here. That is the price of land next to a station. How to judge density properly sets out what the figure does and does not tell you.
Prices and configurations
| Configuration | Size | From |
|---|---|---|
| 3 BHK, 2 toilets | 1,635 and 1,655 sq ft | ₹2.7 Cr* |
| 3 BHK, 3 toilets | 1,810 sq ft | ₹3.0 Cr* |
| 3.5 BHK (4 BHK) | 2,115 sq ft | ₹3.46 Cr* |
All figures are as published by the developer for this project. Prices are indicative, exclude GST, registration and other charges, and change with inventory. Confirm with the project team.
Entry is ₹2.7 Cr*. A starting price is the entry point for a configuration and maps to specific units, floors and facings, so ask which units it currently applies to. Confirm which area basis the size is quoted on before comparing it with anything else.
The neighbourhood
| Category | Published nearby |
|---|---|
| Transit | Kadugodi Tree Park Metro Station, about 180 m |
| Work | ITPL about 1.6 km, EPIP Zone about 2 km |
| Schools | Ujjval World School 5 min · Prajval Vidyanikethan 6 min · PNC cognitio 10 min · Vibgyor Rise 14 min · Pragathi ORCHIDS 3.9 km |
| Healthcare | Sathya Sai Institute of Higher Medical Sciences about 1 km · Aster Hospital 1.8 km · Manipal Hospital 6 min · Jeevika 15 min · Kauvery 17 min |
| Retail | Park Square Mall 1.4 km, about 3 min · Nexus Whitefield 10 min · Virginia Mall 12 min · Lulu Mall 15 min |
Distances are as published by the developer, are indicative, and vary with traffic. Drive the ones that matter to you.
What to verify before booking
RERA: PRM/KA/RERA/1251/446/PR/051024/007125. Verify it at rera.karnataka.gov.in.
- Search the registration on rera.karnataka.gov.in and read the last two quarterly progress filings. The seven checks.
- Confirm the carpet area of the specific unit, and that it matches the agreement for sale.
- Ask for the full cost sheet: everything that sits outside the base price.
- Ask the maintenance rate per square foot and multiply it out over ten years.
- Drive the commute from the gate at 9am, not at the hour of your appointment.
Want the current price sheet for Capitol Residences?
Prices and availability change with inventory. The project team sends the current sheet, floor plans and the charges outside the base price.
Who it suits
It suits a buyer who wants to move in sooner and can fund a shorter payment runway, and whose commute is served by the metro or by ITPL and the EPIP Zone.
It suits you less if you need a longer runway to pay, or if site scale and open ground matter more to you than station proximity. Edition publishes 20 acres and Folium about 83% open greens.
When is possession at Sumadhura Capitol Residences?
December 2027, as published by the developer and declared on the Karnataka RERA registration PRM/KA/RERA/1251/446/PR/051024/007125. The project is under construction. Verify the current declared date on rera.karnataka.gov.in, since a declared date can be extended and the extension appears in the public record.
Is December 2027 earlier than the other Sumadhura projects?
Yes, on the published dates. Folium is published as March 2028, and Edition and Solace as December 2029. Panorama in Devanahalli is a plotted development with Phase 1 open now.
What happens if possession is delayed?
RERA broadly gives you two routes: withdraw and claim a refund with interest, or stay in the project and claim interest for every month of delay. You do not have to cancel to claim. The reference date is the one in your agreement for sale.
Does an earlier possession date cost more?
Not directly, but it shortens the payment runway. The same consideration is collected over fewer years, so the monthly commitment on a construction linked plan is higher than on a project completing two years later. Ask for the payment schedule and check it against your cash flow.
How do I check whether the date is holding?
Read the project's Quarterly Progress Reports on the Karnataka RERA portal. They are filed by the promoter, dated and public. Read the last two or three rather than the latest one, because the useful signal is the trend in slabs cast per quarter.
What is the cost of waiting until possession?
Rent on wherever you live now, plus interest on the portion of your loan already disbursed, every month until you move in. Multiply your monthly rent by the months to possession and add expected interest; that total is the real cost of the wait.